|
Press Releases/Company
Relations
|
| Smart AC Extension Line |
|
GT updates smart AC line project
Gintuga Technologies updated another phase of its AC extension line with voltage/current monitoring-control capabilities project in January 2008.
This phase of the project included the testing of the prototype and firmware verifications; the previously coded firmware was integrated with the hardware for the final testing of the prototype having a specially designed load.
Moreover, several codes involving the firmware had been verified together with some modifications in the hardware. |